De nombreuses provinces, états et compagnies d'électricité proposent des programmes d'incitation, des Primes et des crédits d'impôt pour l'achat et l'installation de systèmes d'alimentation de véhicules électriques. Voici une liste des mesures incitatives auxquelles Grizzl-E peut prétendre.
Cette liste n'est peut-être pas complète. Si vous avez connaissance d'une mesure d'incitation en faveur des systèmes d'alimentation des véhicules électriques qui ne figure pas sur la liste, contactez-nous à [email protected] avec les détails et nous nous renseignerons en votre nom auprès du prestataire qui propose la subvention.
Be installed in Alberta on municipally owned or leased land (assessed on a case-by-case basis) or at a municipally owned facility;
Be a permanent installation (mounted or fixed);
Be new and purchased equipment (not leased);
Be for a new install or an expansion of an existing installation (not for the replacement of an existing installation);
Be an eligible technology used to charge passenger EVs, including charging stations equipped with SAE J1772 standard plug connectors, Combined Charging System (CCS) plug connectors (otherwise known as SAE J1772 Combo), CHAdeMO plug connectors, or other proprietary charging connector types;
Be a networked charger with the ability to communicate to other stations and/or to a server or the cloud through a cellular or wireless signal or connected vehicle communications using software to report on usage and/or other capabilities such as real-time charging station status;
Be approved for sale and use in Canada by a third-party evaluator such as Canadian Standards Association (CSA), Underwriters’ Laboratories of Canada (ULC), Underwriters’ Laboratories (UL), Interlink, or equivalent;
Be installed in accordance with the Alberta Safety Codes Act and in compliance with all applicable local building, electrical, zoning, parking codes and bylaws;
Hold a valid electrical permit and have completed and passed all required inspections;
Be installed by a fully licensed electrical contractor; and
Be installed with a dedicated parking space clearly identified for the purpose of charging EVs, if meant for general public use.
You must be a residential FortisBC electricity or municipal electricity customer of Grand Forks, Penticton, Summerland or Nelson Hydro.
The home where the charging station is to be installed must be at least six months old (i.e. not new construction) and have dedicated parking for residents of the home.
Eligible types of homes include single-family detached homes; mobile homes on a permanent foundation; or side-by-side duplexes with individual electricity meters and garages or dedicated parking for the residents of each unit.
Applications must be submitted within 90 days of the installation of the charging station.